203(k) Eligible Improvements

Mortgage proceeds must be used in part for rehabilitation and/or improvements to a property. There is a minimum $5000 requirement for the eligible improvements on the existing structure(s) on the property. Rehabilitation or improvements to a detached garage, a new detached garage, or the addition of an attached unit(s) (if allowed by the local zoning ordinances) can also be included in this first $5000. Properties with separate detached units are acceptable, however, a newly constructed unit must be attached to an existing unit to be eligible under 203(k).

Any repair is acceptable in the first $5000 requirement that may affect the health and safety of the occupants. Minor-or cosmetic repairs by themselves cannot be included in the first $5000, but may be added after the $5000 threshold is reached.

Examples of eligible improvements are listed below. (This list is not all inclusive.)

  • Structural alterations and reconstruction (e.g., repair or replacement of structural damage, chimney repair, additions to the structure, installation of an additional bath(s), skylights, finished attics and/or basements, repair of termite damage and the treatment against termites or other insect infestation, etc.).
  • Changes for improved functions and modernization (e.g., remodeled bathrooms and kitchens, including permanently installed appliances, i.e., built-in range and/or oven, range hood, microwave, dishwasher).
  • Elimination of health and safety hazards (including the resolution of defective paint surfaces or lead-based paint problems on homes built prior to 1978).
  • Changes for aesthetic appeal and elimination of obsolescence (e.g., new exterior siding, adding a second story to the home, covered porch, stair railings, attached carport).
  • Reconditioning or replacement of plumbing (including connecting to public water and/or sewer system), heating, air conditioning and electrical systems. Installation of new plumbing fixtures is acceptable, including interior whirlpool bathtubs.
  • Installation of Well and/or Septic System. The well or septic system must be installed or repaired prior to beginning any other repairs to the property. A property less than 1/2 acre with a separate well or septic system is not acceptable; also, a property less than one acre with both a well and a septic system is unacceptable. Lots smaller than these sizes usually have problems in the future; however, the local HUD Field Office can approve smaller lot size requirements where the local health authority can justify smaller lots. The installation of a new well or the repair of an existing well (used for the primary water source to the property) can be allowed provided there is adequate documentation to show there is reason to believe the well will produce a sufficient amount of potable water for the occupants. (A well log of surrounding properties from the local health authority is acceptable documentation.)
  • Roofing, gutters and downspouts. Flooring, tiling and carpeting. Energy conservation improvements (e.g., new double pane windows, steel insulated exterior doors, insulation, solar domestic hot water systems, caulking and weatherstripping, etc.).
  • Major landscape work and site improvement (e.g., patios, decks and terraces that improve the value of the property equal to the dollar amount spent on the improvements or required to preserve the property from erosion). The correction of grading and drainage problems is also acceptable. Tree removal is acceptable if the tree is a safety hazard to the property. Repair of existing walks and driveway is acceptable if it may affect the safety of the property. Fencing, new walks and driveways, and general landscape work (i.e., trees, shrubs, seeding or sodding) cannot be in the first $5000 requirement
  • Improvements for accessibility to a Disabled Person (e.g., remodeling kitchens and baths for wheelchair access, lowering kitchen cabinets, installing wider doors and exterior ramps, etc.)

Required Improvements

All rehabilitation construction and/or additions financed with Section 203(k) mortgage proceeds must comply with the following:.

Cost Effective Energy Conservation Standards

  • (1) Addition to Existing Structure. New construction must conform with local codes and HUD Minimum Property Standards in 24 CFR 200.926d
  • (2) Rehabilitation of Existing Structure. To improve the thermal efficiency of the dwelling, the following are required:
  • a) Weatherstrip all doors and windows to reduce infiltration of air when existing weatherstripping is inadequate or nonexistent.
  • b) Caulk or seal all openings, cracks or joints in the building envelope to reduce air infiltration.
  • c) Insulate all openings in exterior walls where the cavity has been exposed as a result of the rehabilitation. Insulate ceiling areas
  • where necessary

  • d) Adequately ventilate attic and crawl space areas.
  • (3) Replacement Systems.
  • a) Heating, ventilating, and air conditioning system supply and return pipes and ducts must be insulated whenever they run through unconditioned spaces.
  • b) Heating systems, burners, and air conditioning systems must be carefully sized to be no greater than 15 percent oversized for the critical design, heating or cooling, except to satisfy the manufacturer’s next closest nominal size.
  • B. Smoke Detectors. Each sleeping area must be provided with a minimum of one (1) approved, listed and labeled smoke detector installed adjacent to the sleeping area.

Required Appraisals

In order to determine the maximum mortgage amount, the 203(k) valuation analysis consists of two separate determinations of value.

The 203(k) program was not intended to be a project mortgage insurance program, as large scale development has considerably more risk than individual single-family mortgage insurance. Therefore, condominium rehabilitation is subject to the following conditions:

  • A. As-is Value. A separate appraisal (Uniform Residential Appraisal Report) may be required to determine the as-is value. However, the lender may determine that an as-is appraisal is not feasible or necessary. In this instance, the lender may use the contract sales price on a purchase transaction, or the existing debt on a refinance transaction, as the as-is value, when this does not exceed a reasonable estimate of value.
  • Further, on a refinance transaction, when a large amount of existing debt (i.e., first and second mortgages) suggests that the borrower has little or no equity in the property, the lender must obtain a current as-is appraisal on which to base the estimated as-is value.
  • On a refinance, the borrower may have substantial equity in the property to assure that no further down payment is required on the new loan amount. In some cases, the borrower will not have an existing mortgage on the property. In this case, the lender should obtain some comparables from a real estate agent/ broker to estimate an approximate as-is value of the property.
  • Another way of establishing the as-is value is to obtain a copy of the local jurisdiction tax valuation on the property.
  • B. Value After Rehabilitation. The expected market value of the property is determined upon completion of the proposed rehabilitation and/or improvements.
  • Only the lesser of five units per condominium association, or 25 percent of the total number of units, can be undergoing rehabilitation at any one time;
  • For a HUD-owned property an as-is appraisal is not required and a DE lender may request the HUD Field Office to release the outstanding HUD Property Disposition appraisal on the property to the lender to establish the maximum mortgage for the property. The HUD appraisal will be considered acceptable for use by the lender if.

(1) it is not over one year old prior to bid acceptance from HUD; and

(2) the sales contract price plus the cost of rehabilitation does not exceed 110 percent of the “As Repaired Value” shown on the HUD appraisal. If the HUD appraisal is insufficient, the DE Lender may order another appraisal to assure the market value of the property will be adequate to make the purchase of the property feasible. For a HUD-property, down payment for an owner-occupant or non-profit organization is three percent of the accepted bid price of the property and 100 percent financing on all other costs.